Installed works rates prices in UAE today

Market prices for Installed works rates in UAE (Dubai): one price per item, with its specification, unit, VAT and check date.
Market day
9 November 2026
Items
73
Prices for
Dubai
Currency
AED

This week's biggest moves

Change compared with the check a week earlier.

  • Large-format tiling, labour only

    77.50 AEDFrom the QSM Database, collected from the market on 11 October 2026Source · −0.6%Source ·
Type

Showing 73 items

Building material prices in UAE
ItemUnitVATPrice (AED)USDWeekDetails for
Installed works rates
Machine excavation in normal soilBulk or trench excavation by machine in sand or normal soil to about 3 m deep, trimming and stockpiling on site; Dubai subcontract rate per m³, labour and plantm³VAT not statedIf the price excludes VAT, add 5%.No data yet——
Interior wall painting, labour rateNewInterior wall painting rate per m² of wall, standard repaint; published rate excl. 5% VATFrom the QSM Database, collected from the market on 17 October 2026Source · m²Excl. 5% VAT15——
Backfilling and compactionBackfilling with approved excavated material in 250 mm layers, watered and compacted to 95% MDD; Dubai subcontract rate per m³, labour and plantm³VAT not statedIf the price excludes VAT, add 5%.No data yet——
Slab formworkFormwork to suspended slab soffits up to 3.5 m high, plywood on steel props, fixing and striking; Dubai subcontract rate per m², labour and formwork materialsm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Steel fixingCutting, bending and fixing rebar of all diameters to drawings, binding wire included, rebar by others; Dubai subcontract rate per ton, labour onlytonVAT not statedIf the price excludes VAT, add 5%.No data yet——
Concrete placingPlacing, vibrating and curing ready-mix concrete in foundations, columns and slabs, concrete and pump by others; Dubai subcontract rate per m³, labour onlym³VAT not statedIf the price excludes VAT, add 5%.No data yet——
Blockwork 200 mm, supply and build200 mm hollow concrete blockwork in cement mortar, blocks, mortar and joint reinforcement included; Dubai subcontract rate per m², supply and buildm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Internal cement plasterInternal cement–sand plaster 15–20 mm in two coats, mesh at joints and corner beads included; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
External cement plasterExternal cement–sand plaster 20–25 mm in two coats with mesh, beads and grooves, scaffolding excluded; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Floor tiling, labour onlyNewFixing porcelain or ceramic floor tiles up to 60×60 cm with adhesive, grouting included, tiles and materials by others; Dubai subcontract rate per m², labour onlyFrom the QSM Database, collected from the market on 11 October 2026Source · m²No VAT55——
Internal emulsion paint systemInternal walls and ceilings: one coat sealer, two coats putty and two coats emulsion (Jotun or National Paints); Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
External paint systemExternal walls: alkali-resistant primer and two coats exterior acrylic emulsion (Jotun or National Paints), scaffolding excluded; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Gypsum board false ceilingNewSuspended gypsum board ceiling 12.5 mm on galvanised MF frame, joints taped and finished ready for paint; Dubai subcontract rate per m², supply and installFrom the QSM Database, collected from the market on 30 October 2026Source · m²VAT not statedIf the price excludes VAT, add 5%.97.50——
Torch-applied membrane waterproofingTorch-applied SBS-modified bitumen membrane 4 mm, one layer on primer, laps sealed, upstands included; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Sand–cement floor screedSand–cement floor screed 50–75 mm, levelled to receive floor finishes; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Mineral fibre tile ceiling 60×60 cmSuspended mineral fibre tile ceiling 600×600 mm on exposed 24 mm T-grid, edge trims included; Dubai subcontract rate per m², supply and installFrom the QSM Database, collected from the market on 23 October 2026Source · m²VAT not statedIf the price excludes VAT, add 5%.75——
Imported fill, placed and compactedApproved imported sweet sand or fill, placed in 250 mm layers and compacted to 95% MDD, material included; Dubai subcontract rate per m³m³VAT not statedIf the price excludes VAT, add 5%.No data yet——
Disposal of surplus materialLoading and carting away surplus excavated material or debris to an approved Dubai Municipality dump, tipping fees included; Dubai subcontract rate per m³m³VAT not statedIf the price excludes VAT, add 5%.No data yet——
Anti-termite soil treatmentPre-construction anti-termite treatment of soil under slabs and foundations with an approved termiticide, warranty certificate included; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Column and wall formworkFormwork to columns and walls, plywood or steel panels, fixing and striking; Dubai subcontract rate per m², labour and formwork materialsm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Blockwork 150 mm, supply and build150 mm hollow concrete blockwork in cement mortar, blocks, mortar and joint reinforcement included; Dubai subcontract rate per m², supply and buildm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Blockwork laying, labour onlyLaying concrete blocks 100–200 mm in cement mortar, blocks and mortar materials by others; Dubai subcontract rate per m², labour onlym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Cement plastering, labour onlyInternal or external cement–sand plaster in two coats, materials by others; Dubai subcontract rate per m², labour onlym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Wall tiling, labour onlyNewFixing ceramic or porcelain wall tiles with adhesive, grouting and trims included, tiles and materials by others; Dubai subcontract rate per m², labour onlyFrom the QSM Database, collected from the market on 11 October 2026Source · m²VAT not statedIf the price excludes VAT, add 5%.70——
Large-format tiling, labour onlyUpdatedFixing large-format porcelain tiles 60×120 cm and larger with adhesive and levelling clips, tiles and materials by others; Dubai subcontract rate per m², labour onlyFrom the QSM Database, collected from the market on 11 October 2026Source · m²VAT not statedIf the price excludes VAT, add 5%.77.50—−0.6%
Marble and granite flooring, labour onlyLaying 2 cm marble or granite floor tiles or slabs in mortar or adhesive, stone and materials by others; Dubai subcontract rate per m², labour onlyFrom the QSM Database, collected from the market on 24 September 2026Source · m²VAT not statedIf the price excludes VAT, add 5%.160Stale——
Epoxy flooring, supply and applyEpoxy floor coating system on prepared concrete, primer and two coats, about 300–500 microns; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Interlock paving, supply and layInterlocking concrete pavers 60–80 mm on compacted sand bed, joints sanded, kerbs excluded; Dubai subcontract rate per m², supply and laym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
External texture coatingTextured acrylic finish to external walls (Terraco Terracoat type): primer and one texture coat, scaffolding excluded; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Drywall partitionDrywall partition: 70 mm metal studs with one layer of 12.5 mm gypsum board each side, joints finished, insulation excluded; Dubai subcontract rate per m², supply and installm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Cementitious waterproofingTwo coats of polymer-modified cementitious waterproofing to wet areas, balconies or tanks; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Roof waterproofing and insulation systemInverted roof: screed to falls, 4 mm membrane, 50 mm XPS insulation, geotextile and protection screed or tiles; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Lighting point wiringLighting point: PVC conduit, 1.5 mm² wires from the board, back box and switch, light fitting excluded; Dubai subcontract rate per point, supply and installpointVAT not statedIf the price excludes VAT, add 5%.No data yet——
13 A socket outlet pointSocket point: PVC conduit, 2.5 mm² wires from the board, back box and 13 A switched socket; Dubai subcontract rate per point, supply and installpointVAT not statedIf the price excludes VAT, add 5%.No data yet——
Plumbing point per fixtureWater supply (PPR, hot and cold) and drainage (uPVC) point per sanitary fixture to the nearest riser or stack, fixture excluded; Dubai subcontract rate per point, supply and installpointVAT not statedIf the price excludes VAT, add 5%.No data yet——
Split AC installationInstalling a wall split AC up to 2 TR with up to 3 m copper piping, insulation, drain pipe and outdoor bracket; unit supplied by others; Dubai rate per unitFrom the QSM Database, collected from the market on 4 October 2026Source · unitVAT not statedIf the price excludes VAT, add 5%.700——
GI ductworkRectangular galvanised steel ductwork to SMACNA, 0.6–1.0 mm sheet, fabricated and installed with supports; Dubai subcontract rate per m² of duct surface, supply and installm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Foundation formworkFormwork to sides of footings, raft edges and grade beams, fixing and striking; Dubai subcontract rate per m², labour and formwork materialsm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Blockwork 100 mm, supply and build100 mm hollow concrete blockwork in cement mortar, blocks and mortar included; UAE subcontract rate per m², supply and buildm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Bitumen coating to substructureTwo coats of bitumen-based coating to concrete in contact with soil (footings, neck columns, grade beams); Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Demolition of reinforced concreteBreaking out reinforced concrete with hydraulic breakers, loading and disposal off site included; Dubai subcontract rate per m³m³VAT not statedIf the price excludes VAT, add 5%.No data yet——
Polythene sheet under slabs1000-gauge (0.25 mm) polythene sheet laid under ground slabs with 150 mm laps; Dubai subcontract rate per m², supply and laym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Gypsum plaster to wallsSingle-coat gypsum plaster to internal blockwork walls, ready for paint; UAE subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Marble floor grinding and polishingGrinding, polishing and crystallising marble floors after installation; Dubai subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Skirting fixing, labour onlyFixing tile, porcelain or marble skirting with adhesive, grouting included, materials by others; Dubai subcontract rate per linear m, labour onlylinear mVAT not statedIf the price excludes VAT, add 5%.No data yet——
Enamel paint to metal or timberAlkyd enamel to new steelwork: one primer and two finishing coats; UAE subcontract rate per m², supply and applym²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Duct insulation 25 mmClosed-cell elastomeric or fibreglass insulation 25 mm to supply ducts, with foil tape and finishing; Dubai subcontract rate per m², supply and installm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Pre-insulated panel ductworkPre-insulated panel ductwork, small ducts up to 400 mm, fabricated and installed with supports; UAE subcontract rate per m², supply and installm²VAT not statedIf the price excludes VAT, add 5%.No data yet——
Site hoarding 2.4 mTemporary site hoarding 2.4 m high, GI sheet on steel frame; UAE subcontract rate per linear m, supply and erectlinear mVAT not statedIf the price excludes VAT, add 5%.No data yet——
Removing asphalt paving by mechanical breaker, including cart awayAsphalt pavement, priced per m³ of asphalt (source unit) — Breaking and cart awaym³VAT not statedIf the price excludes VAT, add 5%.No data yet——

Need a price for your own specification or quantity? Ask Quanta

About “market price on its date”

Every price here comes from the QSM Database: a market price on the date shown with it, with the conditions it holds for. The price on your order changes with quantity, supplier, payment terms and delivery point.