Skip to content

Market prices/Saudi Arabia/Installed works rates

Installed works rates prices in Saudi Arabia today

Market prices for Installed works rates in Saudi Arabia (Riyadh): one price per item, with its specification, unit, VAT and check date.
Market day
27 October 2026
Items
100
Prices for
Riyadh
Currency
SAR
Type

Showing 100 items

Building material prices in Saudi Arabia
ItemUnitVATPrice (SAR)USDWeekDetails for
Installed works rates
Plaster mason, manpower supply company, hourly ratePlaster mason, manpower supply company, hourly rate (company rate card, Saudi Arabia)hourVAT not statedIf the price excludes VAT, add 15%.No data yet——
Plumber, manpower supply company, hourly ratePlumber, manpower supply company, hourly rate (company rate card, Saudi Arabia)hourVAT not statedIf the price excludes VAT, add 15%.No data yet——
Structural frame (skeleton), labour onlyLabour-only rate for a villa or low-rise skeleton: formwork, steel fixing, casting and blockwork, with the contractor's formwork and tools; materials by the owner; Riyadh rate per m² of built-up aream²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Structural frame (skeleton) with materialsSupply and install (labour and materials) of a villa or low-rise skeleton: concrete, rebar, blocks, formwork and labour, excavation and finishes excluded; Riyadh rate per m² of built-up aream²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Machine excavation in normal soilExcavation in any soil except rock, including loading and spreading within the site; subcontract rate with equipment, fuel and operators, per m³ in place, Riyadhm³VAT not statedIf the price excludes VAT, add 15%.No data yet——
Steel fixing, labour onlyCut, bend and fix reinforcement including tie wire; steel supplied by others; labour-only subcontract rate per ton fixed, RiyadhtonVAT not statedIf the price excludes VAT, add 15%.No data yet——
Hollow blockwork 20 cm, supply and laySupply and install (labour and materials): 20 cm hollow concrete block walls in cement mortar, including wall ties, lintels excluded; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Blockwork, labour onlyLabour-only rate for laying 15–20 cm concrete blocks, blocks and mortar materials by others; Riyadh subcontract rate per m² of wallm²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Internal cement plaster, supply and applySupply and install (labour and materials): internal cement-sand plaster about 2 cm with corner beads and mesh at joints; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Plastering, labour onlyLabour-only rate for cement plaster on walls and ceilings, materials by others; Riyadh subcontract rate per m²m²No VATNo data yet——
Floor tiling, labour onlyLabour-only rate for ceramic or porcelain floor tiles up to 60×60 cm, fixed with adhesive or mortar and grouted; tiles and adhesive by others; Riyadh rate per m²m²No VATNo data yet——
Internal emulsion painting, supply and applyNewSupply and install (labour and materials): two coats putty, one sealer and two coats emulsion, mid-range brand (Jotun, Jazeera or similar); Riyadh subcontract rate per m²From the QSM Database, collected from the market on 22 October 2026Source · m²VAT not statedIf the price excludes VAT, add 15%.22——
Painting, labour onlyNewLabour-only rate for putty, sealer and two coats of emulsion on walls and ceilings, materials by others; Riyadh subcontract rate per m²From the QSM Database, collected from the market on 22 October 2026Source · m²No VAT10——
Roof waterproofing, bitumen membrane 4 mmSupply and install (labour and materials): primer and torch-applied 4 mm polyester-reinforced bitumen membrane with laps and upturns; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Gypsum board ceiling, supply and installSupply and install (labour and materials): 12.5 mm gypsum board on galvanised framing, flat, taped and filled ready for paint; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Electrical rough-in, labour onlyLabour-only rate for electrical rough-in of a villa or flat (conduits, boxes and wiring), materials by others; Riyadh rate per m² of built-up aream²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Plumbing rough-in, labour onlyLabour-only rate for plumbing rough-in of a villa or flat (supply and drainage pipework), materials by others; Riyadh rate per m² of built-up aream²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Rock excavation with hydraulic breakerExcavation in rock using an excavator-mounted breaker, including loading within the site; subcontract rate with equipment and operators, per m³ in place, Riyadhm³VAT not statedIf the price excludes VAT, add 15%.No data yet——
Backfill with excavated material, compactedBackfill in 25 cm layers with watering and mechanical compaction to 95% Proctor, material from site; subcontract rate with equipment, per m³ compacted, Riyadhm³VAT not statedIf the price excludes VAT, add 15%.No data yet——
Backfill with imported selected fill, compactedSupply and install (labour and materials): imported selected fill (wadi sand and gravel) in 25 cm layers, watered and compacted to 95% Proctor; Riyadh rate per m³ compactedm³VAT not statedIf the price excludes VAT, add 15%.No data yet——
Cart away surplus soil to municipal dumpLoad and haul surplus excavated material to an approved municipal dump outside the site, dump fees included where charged; Riyadh rate per m³ loosem³VAT not statedIf the price excludes VAT, add 15%.No data yet——
Anti-termite soil treatmentSupply and install (labour and materials): pre-construction soil treatment with approved termiticide under foundations and slabs, with certificate; Riyadh rate per m² treatedm²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Plain concrete blinding 10 cmSupply and install (labour and materials): plain ready-mix blinding concrete 10 cm under foundations, levelled; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Formwork to foundations and ground beamsFormwork labour with the contractor's plywood, timber and nails, erected and stripped; Riyadh subcontract rate per m² of contact aream²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Formwork to columns and wallsFormwork labour with the contractor's plywood or steel forms, timber and nails, erected and stripped; Riyadh subcontract rate per m² of contact aream²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Formwork to slabs and beamsFormwork labour with the contractor's plywood, props and timber, erected and stripped, up to 3.5 m high; Riyadh subcontract rate per m² of contact aream²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Concrete placing, labour onlyLabour-only rate to place, vibrate and cure ready-mix concrete, concrete and pump by others; Riyadh subcontract rate per m³m³VAT not statedIf the price excludes VAT, add 15%.No data yet——
Reinforced concrete slabs and beams, completeSupply and install (labour and materials): C30 ready-mix with about 100–120 kg/m³ rebar, formwork, pump and labour; Riyadh rate per m³ of concretem³VAT not statedIf the price excludes VAT, add 15%.No data yet——
Hollow blockwork 10 cm, supply and laySupply and install (labour and materials): 10 cm concrete block partitions in cement mortar; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Insulated blockwork 20 cm, supply and laySupply and install (labour and materials): 20 cm block with polystyrene insert for external walls, in cement mortar; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
External cement plaster, supply and applySupply and install (labour and materials): external cement-sand plaster about 2.5 cm in two coats with mesh and beads, scaffolding excluded; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Cement-sand floor screed 5 cmSupply and install (labour and materials): cement-sand screed about 5 cm, levelled for tiling; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Porcelain floor tiling, supply and installSupply and install (labour and materials): mid-range porcelain 60×60 cm on adhesive with grout and skirting; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Wall tiling, labour onlyLabour-only rate for ceramic or porcelain wall tiles in bathrooms and kitchens, fixed with adhesive and grouted; materials by others; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Large-format tiling 60×120 cm and up, labour onlyLabour-only rate for porcelain 60×120 cm and larger with levelling clips, adhesive and grout by others; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Marble or granite flooring, labour onlyLabour-only rate for fixing 2 cm marble or granite floor tiles on mortar bed, stone and mortar by others; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Riyadh stone facade cladding, supply and installSupply and install (labour and materials): Riyadh limestone 3–4 cm fixed with stainless anchors or mortar, including pointing, scaffolding excluded; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
External acrylic painting, supply and applySupply and install (labour and materials): exterior primer and two coats acrylic emulsion (Jotun, Jazeera or similar), scaffolding excluded; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Exterior texture spray finish, supply and applySupply and install (labour and materials): primer, textured spray coat and acrylic top coat, scaffolding excluded; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Cementitious waterproofing for wet areasSupply and install (labour and materials): two coats flexible cementitious waterproofing with upturns 30 cm, for bathrooms, kitchens and balconies; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Bitumen coating to foundations, 2 coatsSupply and install (labour and materials): primer and two coats bitumen paint on foundations, ground beams and buried surfaces; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Roof waterproofing and insulation systemSupply and install (labour and materials): screed to falls, 4 mm membrane, 5 cm XPS, geotextile and protection screed, finish tiles excluded; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Sprayed polyurethane foam roof insulationSupply and install (labour and materials): sprayed polyurethane foam about 3–5 cm, density about 40–45 kg/m³, with UV-protective top coat; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Gypsum board ceiling, labour onlyLabour-only rate for flat gypsum board ceilings on galvanised framing, taped and filled; materials by others; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Drywall partition, supply and installSupply and install (labour and materials): 70 mm studs at 60 cm, one 12.5 mm board each side, taped and filled, insulation excluded; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Lay-in ceiling tiles 60×60 cm with gridSupply and install (labour and materials): exposed T-24 grid with gypsum or mineral fibre tiles 60×60 cm; Riyadh subcontract rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Interlock paving 6 cm, supply and installSupply and install (labour and materials): grey concrete interlock 6 cm on 5 cm sand bed, compacted and joint-filled, kerbs excluded; Riyadh rate per m²m²VAT not statedIf the price excludes VAT, add 15%.No data yet——
Lighting point, supply and installSupply and install (labour and materials): conduit, 1.5–2.5 mm² wiring and switch to one lighting outlet, light fitting excluded; Riyadh rate per pointpointVAT not statedIf the price excludes VAT, add 15%.No data yet——
Socket outlet point, supply and installSupply and install (labour and materials): conduit, 2.5–4 mm² wiring and 13 A socket outlet, mid-range brand; Riyadh rate per pointpointVAT not statedIf the price excludes VAT, add 15%.No data yet——
Split AC installationInstall one wall split unit with up to 4 m copper pipe, insulation, drain and bracket (labour and fixing materials), extra pipe excluded; Riyadh rate per unitunitVAT not statedIf the price excludes VAT, add 15%.No data yet——

Need a price for your own specification or quantity? Ask Quanta

About “market price on its date”

Every price here comes from the QSM Database: a market price on the date shown with it, with the conditions it holds for. The price on your order changes with quantity, supplier, payment terms and delivery point.

Need the price of your own item?

This page shows common items. Quanta prices any item to your specification, quantity and site, with its conditions.

Ask Quanta about any item