Building material prices in Saudi Arabia
Market day 27 October 2026 · Riyadh · SAR
| Item | Specification and conditions | Unit | VAT | Price (SAR) | Week |
|---|---|---|---|---|---|
| Installed works rates | |||||
| Plaster mason, manpower supply company, hourly rate | Plaster mason, manpower supply company, hourly rate (company rate card, Saudi Arabia) | hour | VAT not stated · Supply and install | No data yet | — |
| Plumber, manpower supply company, hourly rate | Plumber, manpower supply company, hourly rate (company rate card, Saudi Arabia) | hour | VAT not stated · Supply and install | No data yet | — |
| Structural frame (skeleton), labour only | Labour-only rate for a villa or low-rise skeleton: formwork, steel fixing, casting and blockwork, with the contractor's formwork and tools; materials by the owner; Riyadh rate per m² of built-up area | m² | VAT not stated · Labour | No data yet | — |
| Structural frame (skeleton) with materials | Supply and install (labour and materials) of a villa or low-rise skeleton: concrete, rebar, blocks, formwork and labour, excavation and finishes excluded; Riyadh rate per m² of built-up area | m² | VAT not stated · Supply and install | No data yet | — |
| Machine excavation in normal soil | Excavation in any soil except rock, including loading and spreading within the site; subcontract rate with equipment, fuel and operators, per m³ in place, Riyadh | m³ | VAT not stated · Supply and install | No data yet | — |
| Steel fixing, labour only | Cut, bend and fix reinforcement including tie wire; steel supplied by others; labour-only subcontract rate per ton fixed, Riyadh | ton | VAT not stated · Labour | No data yet | — |
| Hollow blockwork 20 cm, supply and lay | Supply and install (labour and materials): 20 cm hollow concrete block walls in cement mortar, including wall ties, lintels excluded; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Blockwork, labour only | Labour-only rate for laying 15–20 cm concrete blocks, blocks and mortar materials by others; Riyadh subcontract rate per m² of wall | m² | VAT not stated · Labour | No data yet | — |
| Internal cement plaster, supply and apply | Supply and install (labour and materials): internal cement-sand plaster about 2 cm with corner beads and mesh at joints; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Plastering, labour only | Labour-only rate for cement plaster on walls and ceilings, materials by others; Riyadh subcontract rate per m² | m² | No VAT · Labour | No data yet | — |
| Floor tiling, labour only | Labour-only rate for ceramic or porcelain floor tiles up to 60×60 cm, fixed with adhesive or mortar and grouted; tiles and adhesive by others; Riyadh rate per m² | m² | No VAT · Labour | No data yet | — |
| Internal emulsion painting, supply and apply | Supply and install (labour and materials): two coats putty, one sealer and two coats emulsion, mid-range brand (Jotun, Jazeera or similar); Riyadh subcontract rate per m²From the QSM Database, collected from the market on 22 October 2026Source · | m² | VAT not stated · Supply and install | 22 | — |
| Painting, labour only | Labour-only rate for putty, sealer and two coats of emulsion on walls and ceilings, materials by others; Riyadh subcontract rate per m²From the QSM Database, collected from the market on 22 October 2026Source · | m² | No VAT · Labour | 10 | — |
| Roof waterproofing, bitumen membrane 4 mm | Supply and install (labour and materials): primer and torch-applied 4 mm polyester-reinforced bitumen membrane with laps and upturns; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Gypsum board ceiling, supply and install | Supply and install (labour and materials): 12.5 mm gypsum board on galvanised framing, flat, taped and filled ready for paint; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Electrical rough-in, labour only | Labour-only rate for electrical rough-in of a villa or flat (conduits, boxes and wiring), materials by others; Riyadh rate per m² of built-up area | m² | VAT not stated · Labour | No data yet | — |
| Plumbing rough-in, labour only | Labour-only rate for plumbing rough-in of a villa or flat (supply and drainage pipework), materials by others; Riyadh rate per m² of built-up area | m² | VAT not stated · Labour | No data yet | — |
| Rock excavation with hydraulic breaker | Excavation in rock using an excavator-mounted breaker, including loading within the site; subcontract rate with equipment and operators, per m³ in place, Riyadh | m³ | VAT not stated · Supply and install | No data yet | — |
| Backfill with excavated material, compacted | Backfill in 25 cm layers with watering and mechanical compaction to 95% Proctor, material from site; subcontract rate with equipment, per m³ compacted, Riyadh | m³ | VAT not stated · Supply and install | No data yet | — |
| Backfill with imported selected fill, compacted | Supply and install (labour and materials): imported selected fill (wadi sand and gravel) in 25 cm layers, watered and compacted to 95% Proctor; Riyadh rate per m³ compacted | m³ | VAT not stated · Supply and install | No data yet | — |
| Cart away surplus soil to municipal dump | Load and haul surplus excavated material to an approved municipal dump outside the site, dump fees included where charged; Riyadh rate per m³ loose | m³ | VAT not stated · Supply and install | No data yet | — |
| Anti-termite soil treatment | Supply and install (labour and materials): pre-construction soil treatment with approved termiticide under foundations and slabs, with certificate; Riyadh rate per m² treated | m² | VAT not stated · Supply and install | No data yet | — |
| Plain concrete blinding 10 cm | Supply and install (labour and materials): plain ready-mix blinding concrete 10 cm under foundations, levelled; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Formwork to foundations and ground beams | Formwork labour with the contractor's plywood, timber and nails, erected and stripped; Riyadh subcontract rate per m² of contact area | m² | VAT not stated · Supply and install | No data yet | — |
| Formwork to columns and walls | Formwork labour with the contractor's plywood or steel forms, timber and nails, erected and stripped; Riyadh subcontract rate per m² of contact area | m² | VAT not stated · Supply and install | No data yet | — |
| Formwork to slabs and beams | Formwork labour with the contractor's plywood, props and timber, erected and stripped, up to 3.5 m high; Riyadh subcontract rate per m² of contact area | m² | VAT not stated · Supply and install | No data yet | — |
| Concrete placing, labour only | Labour-only rate to place, vibrate and cure ready-mix concrete, concrete and pump by others; Riyadh subcontract rate per m³ | m³ | VAT not stated · Labour | No data yet | — |
| Reinforced concrete slabs and beams, complete | Supply and install (labour and materials): C30 ready-mix with about 100–120 kg/m³ rebar, formwork, pump and labour; Riyadh rate per m³ of concrete | m³ | VAT not stated · Supply and install | No data yet | — |
| Hollow blockwork 10 cm, supply and lay | Supply and install (labour and materials): 10 cm concrete block partitions in cement mortar; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Insulated blockwork 20 cm, supply and lay | Supply and install (labour and materials): 20 cm block with polystyrene insert for external walls, in cement mortar; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| External cement plaster, supply and apply | Supply and install (labour and materials): external cement-sand plaster about 2.5 cm in two coats with mesh and beads, scaffolding excluded; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Cement-sand floor screed 5 cm | Supply and install (labour and materials): cement-sand screed about 5 cm, levelled for tiling; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Porcelain floor tiling, supply and install | Supply and install (labour and materials): mid-range porcelain 60×60 cm on adhesive with grout and skirting; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Wall tiling, labour only | Labour-only rate for ceramic or porcelain wall tiles in bathrooms and kitchens, fixed with adhesive and grouted; materials by others; Riyadh rate per m² | m² | VAT not stated · Labour | No data yet | — |
| Large-format tiling 60×120 cm and up, labour only | Labour-only rate for porcelain 60×120 cm and larger with levelling clips, adhesive and grout by others; Riyadh rate per m² | m² | VAT not stated · Labour | No data yet | — |
| Marble or granite flooring, labour only | Labour-only rate for fixing 2 cm marble or granite floor tiles on mortar bed, stone and mortar by others; Riyadh rate per m² | m² | VAT not stated · Labour | No data yet | — |
| Riyadh stone facade cladding, supply and install | Supply and install (labour and materials): Riyadh limestone 3–4 cm fixed with stainless anchors or mortar, including pointing, scaffolding excluded; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| External acrylic painting, supply and apply | Supply and install (labour and materials): exterior primer and two coats acrylic emulsion (Jotun, Jazeera or similar), scaffolding excluded; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Exterior texture spray finish, supply and apply | Supply and install (labour and materials): primer, textured spray coat and acrylic top coat, scaffolding excluded; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Cementitious waterproofing for wet areas | Supply and install (labour and materials): two coats flexible cementitious waterproofing with upturns 30 cm, for bathrooms, kitchens and balconies; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Bitumen coating to foundations, 2 coats | Supply and install (labour and materials): primer and two coats bitumen paint on foundations, ground beams and buried surfaces; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Roof waterproofing and insulation system | Supply and install (labour and materials): screed to falls, 4 mm membrane, 5 cm XPS, geotextile and protection screed, finish tiles excluded; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Sprayed polyurethane foam roof insulation | Supply and install (labour and materials): sprayed polyurethane foam about 3–5 cm, density about 40–45 kg/m³, with UV-protective top coat; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Gypsum board ceiling, labour only | Labour-only rate for flat gypsum board ceilings on galvanised framing, taped and filled; materials by others; Riyadh rate per m² | m² | VAT not stated · Labour | No data yet | — |
| Drywall partition, supply and install | Supply and install (labour and materials): 70 mm studs at 60 cm, one 12.5 mm board each side, taped and filled, insulation excluded; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Lay-in ceiling tiles 60×60 cm with grid | Supply and install (labour and materials): exposed T-24 grid with gypsum or mineral fibre tiles 60×60 cm; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Interlock paving 6 cm, supply and install | Supply and install (labour and materials): grey concrete interlock 6 cm on 5 cm sand bed, compacted and joint-filled, kerbs excluded; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Lighting point, supply and install | Supply and install (labour and materials): conduit, 1.5–2.5 mm² wiring and switch to one lighting outlet, light fitting excluded; Riyadh rate per point | point | VAT not stated · Supply and install | No data yet | — |
| Socket outlet point, supply and install | Supply and install (labour and materials): conduit, 2.5–4 mm² wiring and 13 A socket outlet, mid-range brand; Riyadh rate per point | point | VAT not stated · Supply and install | No data yet | — |
| Split AC installation | Install one wall split unit with up to 4 m copper pipe, insulation, drain and bracket (labour and fixing materials), extra pipe excluded; Riyadh rate per unit | unit | VAT not stated · Supply and install | No data yet | — |
| Ribbed (hordi) slab with block infill | Supply and install (labour and materials): ribbed slab 25–30 cm with hollow or polystyrene block infill, concrete, rebar, formwork and labour; Riyadh rate per m² of slab | m² | VAT not stated · Supply and install | No data yet | — |
| AAC blockwork 20 cm, supply and lay | Supply and install (labour and materials): 20 cm autoclaved aerated concrete blocks in thin-bed mortar; Riyadh subcontract rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Self-levelling screed 3–5 mm | Supply and install (labour and materials): primer and cement-based self-levelling compound 3–5 mm under vinyl or SPC flooring; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Skirting fixing, labour only | Labour-only rate for ceramic, porcelain or marble skirting up to 10 cm high, materials by others; Riyadh rate per linear metre | linear metre | VAT not stated · Labour | No data yet | — |
| Marble grinding and polishing | Grinding, honing and polishing of installed marble floors with machines and abrasives (labour, equipment and materials); Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Granite stair treads and risers, supply and install | Supply and install (labour and materials): 3 cm granite tread and 2 cm riser, polished nosing, about 1.2 m wide; Riyadh rate per linear metre of step | linear metre | VAT not stated · Supply and install | No data yet | — |
| Epoxy floor coating, supply and apply | Supply and install (labour and materials): surface grinding, primer, filler coat and two coats epoxy, about 300–500 microns; Riyadh rate per m² | m² | VAT not stated · Supply and install | No data yet | — |
| Foam concrete to roof falls | Supply and install (labour and materials): lightweight foam concrete for roof falls and insulation, density about 400–600 kg/m³; Riyadh rate per m³ | m³ | VAT not stated · Supply and install | No data yet | — |
| Gypsum cornice, supply and install | Supply and install (labour and materials): cast gypsum cornice about 10–15 cm, fixed and jointed ready for paint; Riyadh rate per linear metre | linear metre | VAT not stated · Supply and install | No data yet | — |
| SPC, vinyl or laminate flooring, labour only | Labour-only rate for click SPC, laminate or glue-down vinyl flooring on a prepared floor, materials by others; Riyadh rate per m² | m² | VAT not stated · Labour | No data yet | — |
| Fixing sanitary ware, labour only | Labour-only rate to fix and connect one fixture (WC, basin, sink or heater), fixtures by others; Riyadh rate per fixture | each | VAT not stated · Labour | No data yet | — |
| GI ductwork, supply and install | Supply and install (labour and materials): galvanised sheet ductwork fabricated to SMACNA with hangers and joints, insulation excluded; Riyadh rate per kg of sheet | kg | VAT not stated · Supply and install | No data yet | — |
| Inspection chamber 60×60 cm, built | Supply and install (labour and materials): inspection chamber 60×60 cm up to 1 m deep in blockwork or concrete with plaster, benching and cover, tested; Riyadh rate each | each | VAT not stated · Supply and install | No data yet | — |
| Demolition of reinforced concrete by machine | Break out reinforced concrete with mechanical equipment, including loading and moving debris within the site; Riyadh rate per m³ | m³ | VAT not stated · Supply and install | No data yet | — |
| Removal of floor tiles and bedding | Remove existing ceramic, porcelain or marble flooring with its bedding, bag and stack debris on site; Riyadh labour rate per m² | m² | VAT not stated · Labour | No data yet | — |
| Site hoarding, corrugated sheet 2.5 m | Supply and install (labour and materials): temporary site hoarding of corrugated galvanised sheet on steel posts, 2.5 m high; Riyadh rate per linear metre | linear metre | VAT not stated · Supply and install | No data yet | — |
| Disposal of broken concrete off site, per m³ solid | Broken concrete or masonry measured solid, 1.3 bulking factor, 20 m³ tippers within Riyadh — Haulage only; loading and dump fees excluded | m³ | VAT not stated · Supply and install | No data yet | — |
| Disposal of debris off site, per tipper trip | One load of a tipper of about 20 m³ (debris, soil or broken concrete) within Riyadh, with driver — Haulage within Riyadh; loading and dump fees excluded | trip | VAT not stated · Supply and install | No data yet | — |
| Machine excavation in normal soil | Excavation in any soil except rock, including loading and spreading within the site; subcontract rate with equipment, fuel and operators — Excavation, loading and spreading on site; disposal off site, shoring and dewatering excluded; rock excluded. | m³ | VAT not stated · Supply and install | No data yet | — |
| Sandwich panel 75 mm, roof or wall (core not specified) | 75 mm insulated panel, core PU or rock wool as offered (sources do not name it), pre-painted steel skins — Panels with 0.5 mm pre-painted steel skins, fixings; supply and install; flashings and trims not stated by sources | m² | VAT not stated · Supply and install | No data yet | — |
| Sandwich panel installation, labourStale | Fixing roof or wall panels at 6–12 m height, panels by others — Labour and fixing; panels, flashings and lifting plant not statedFrom the QSM Database, collected from the market on 5 May 2026Source · | m² | VAT not stated · Labour | 22.50 | — |
| Sandwich panel, PU core 100 mm, roof or wallStale | Polyurethane (PU/PUR) core 100 mm, pre-painted steel skins, no fire rating stated — Panels with 0.5 mm pre-painted steel skins, fixings; supply and install; flashings and trims not stated by sourcesFrom the QSM Database, collected from the market on 6 September 2026Source · | m² | VAT not stated · Supply and install | 245 | — |
| Sandwich panel, PU core 50 mm, roof or wallStale | Polyurethane (PU/PUR) core 50 mm, pre-painted steel skins, no fire rating stated — Panels with 0.5 mm pre-painted steel skins, fixings; supply and install; flashings and trims not stated by sourcesFrom the QSM Database, collected from the market on 6 September 2026Source · | m² | VAT not stated · Supply and install | 185 | — |
| Sandwich panel, rock wool core 100 mm, fire-resistant, roof | Rock wool core 100 mm (non-combustible core; fire rating to be confirmed by the maker), pre-painted steel skins, roof at 6–12 m height — Panel supply plus installation at 6–12 m height; flashings and trims excluded | m² | VAT not stated · Supply and install | No data yet | — |
| Steel structure for hangar or aircraft shelter, 25–40 m clear span | Portal or truss frame, high eaves (10–13 m), 25–40 m clear span; 45 kg/m² of plan area — Primary and secondary steel (frames, purlins, rails, bracing) supplied, fabricated, painted and erected; cladding, foundations and anchor bolts excluded | m² of covered plan area | VAT not stated · Supply and install | No data yet | — |
| Steel structure for hangar, 60–80 m clear span | Long-span truss hangar, 60–80 m clear span; 66.5 kg/m² of plan area — Primary and secondary steel (frames, purlins, rails, bracing) supplied, fabricated, painted and erected; cladding, foundations and anchor bolts excluded | m² of covered plan area | VAT not stated · Supply and install | No data yet | — |
| Structural steel, supply, fabricate, paint and erect | Hot-rolled steel beams and frames for buildings, item rate per tonne installed; one rate for all section weights (no light/medium/heavy split found) — Supply, fabrication, erection; painting assumed in the item rate (source does not itemise) | ton | VAT not stated · Supply and install | No data yet | — |
| Steel structure for warehouse, 20–40 m clear span | Portal frame, low eaves (6–8 m), 20–40 m clear span; 35 kg/m² of plan area — Primary and secondary steel (frames, purlins, rails, bracing) supplied, fabricated, painted and erected; cladding, foundations and anchor bolts excluded | m² of covered plan area | VAT not stated · Supply and install | No data yet | — |
| Reinforced concrete isolated footings | RC pad footings C30–C40 (SRC where needed), about 2.0×2.0×0.6 m, 110 kg rebar per m³ — Concrete, rebar and side formwork. Excavation, blinding, bitumen coating and backfill excluded. | m³ | VAT not stated · Supply and install | No data yet | — |
| Reinforced concrete tie / grade beams | RC tie or grade beams C30–C40, about 0.4×0.6 m section, 150 kg rebar per m³ — Concrete, rebar and formwork to both sides. Excavation, blinding, bitumen coating and backfill excluded. | m³ | VAT not stated · Supply and install | No data yet | — |
| RC slab on grade 20 cm | Ground-bearing RC slab 200 mm, C30–C40, rebar 115 kg/m³ (two layers), on polyethylene sheet — Concrete, rebar, polyethylene sheet. Sub-base, compaction, edge formwork, joints, hardener and finishes excluded. | m² | VAT not stated · Supply and install | No data yet | — |
| RC slab on grade 30 cm | Ground-bearing RC slab 300 mm, C30–C40, rebar 115 kg/m³ (two layers), on polyethylene sheet — Concrete, rebar, polyethylene sheet. Sub-base, compaction, edge formwork, joints, hardener and finishes excluded. | m² | VAT not stated · Supply and install | No data yet | — |
| RC slab on grade 45 cm | Ground-bearing RC slab 450 mm, C30–C40, rebar 115 kg/m³ (two layers), on polyethylene sheet — Concrete, rebar, polyethylene sheet. Sub-base, compaction, edge formwork, joints, hardener and finishes excluded. | m² | VAT not stated · Supply and install | No data yet | — |
| Excavation for foundations in normal soilStale | Machine excavation for footings and trenches up to about 2 m deep in any soil except rock — Excavation and depositing beside the excavation. Disposal off site, shoring, dewatering and rock excluded.From the QSM Database, collected from the market on 1 February 2026Source · | m³ | VAT not stated · Supply and install | 35 | — |
| Excavation in rock | Excavation in rock (Riyadh limestone) by excavator with hydraulic breaker, foundations and trenches — Breaking, excavating and depositing beside the excavation. Blasting, disposal off site and dewatering excluded. | m³ | VAT not stated · Supply and install | No data yet | — |
| Backfill with imported selected material, compacted in layersStale | Imported selected fill placed and compacted in layers (about 20–25 cm) around foundations and structures — Supply of fill, placing, watering and compaction. Testing assumed included.From the QSM Database, collected from the market on 25 December 2025Source · | m³ | VAT not stated · Supply and install | 75 | — |
| Disposal of excavated material and debris off siteStale | Load, haul and dump surplus excavated material or broken debris to an approved tip, measured in place — Loading, haulage and dumping. Tipping fees, if charged, not stated by the source.From the QSM Database, collected from the market on 25 December 2025Source · | m³ | VAT not stated · Supply and install | 22.50 | — |
| Underground RC water / fire-water tank, 250 m³, full scope | Internal 8.0×7.0 m, clear height 5.0 m, water depth 4.5 m (252.0 m³ net); base 0.45 m, walls 0.35 m, roof 0.3 m on 1 column(s); roof top at ground level | m³ of net capacity | VAT not stated · Supply and install | No data yet | — |
| Underground RC water / fire-water tank, 500 m³, full scope | Internal 12.0×9.3 m, clear height 5.0 m, water depth 4.5 m (502.2 m³ net); base 0.5 m, walls 0.4 m, roof 0.3 m on 2 column(s); roof top at ground level | m³ of net capacity | VAT not stated · Supply and install | No data yet | — |
| Underground RC water / fire-water tank, 750 m³, full scope | Internal 15.0×11.2 m, clear height 5.0 m, water depth 4.5 m (756.0 m³ net); base 0.5 m, walls 0.4 m, roof 0.3 m on 4 column(s); roof top at ground level | m³ of net capacity | VAT not stated · Supply and install | No data yet | — |
| Underground RC water / fire-water tank, 1000 m³, full scope | Internal 17.0×13.1 m, clear height 5.0 m, water depth 4.5 m (1002.15 m³ net); base 0.5 m, walls 0.4 m, roof 0.3 m on 6 column(s); roof top at ground level | m³ of net capacity | VAT not stated · Supply and install | No data yet | — |
| Underground RC pump room shell, full structural scope | Buried RC box beside the tank, built in the same open cut: internal 10×6 m, clear height 4.5 m, base 0.4 m, walls 0.3 m, roof 0.25 m — Excavation within the tank open cut, dewatering allowance, blinding, RC base, walls and roof with rebar and formwork, waterstop, external membrane, imported backfill, disposal. Excludes stair/access shaft, doors, hatches, sump, finishes, plinths and all MEP. | m² of internal floor area | VAT not stated · Supply and install | No data yet | — |
| Breaking out reinforced concrete slabs and footings | Break out RC slabs and footings by excavator-mounted breaker, cut rebar, stockpile rubble on site — Breaking, cutting rebar and stockpiling. Excavation to expose buried footings, disposal off site (add 22.50 SAR/m³) and scrap credit excluded. | m³ | VAT not stated · Supply and install | No data yet | — |
| Removing asphalt paving | Break up and remove 120 mm asphalt (wearing + binder course), load and dispose off site — Breaking, loading and disposal off site. Saw-cutting edges, sub-base removal and reinstatement excluded. | m² | VAT not stated · Supply and install | No data yet | — |
| Removing concrete paving | Break up and remove 150 mm plain concrete paving, load and dispose off site — Breaking, loading and disposal off site. Saw-cutting edges, sub-base removal and reinstatement excluded. | m² | VAT not stated · Supply and install | No data yet | — |
| Removing buried steel pipeline incl. excavation and backfill | Steel pipe up to DN300, trench 1.2 m wide × 2.0 m deep — Excavation, removal, imported backfill compacted, disposal of soil. Scrap value, hazardous contents (fuel, oil), shoring, rock and surface reinstatement excluded. | m | VAT not stated · Supply and install | No data yet | — |
| Removing buried cables incl. excavation and backfill | LV/MV or earthing cables, trench 0.6 m wide × 1.0 m deep — Excavation, removal, imported backfill compacted, disposal of soil. Scrap value, hazardous contents (fuel, oil), shoring, rock and surface reinstatement excluded. | m | VAT not stated · Supply and install | No data yet | — |
| Site clearance | Clear site of vegetation, rubbish and debris and strip the top 150 mm, with disposal off site — Stripping 150 mm and disposal. Tree felling, demolition of structures and removal of buried services excluded. | m² | VAT not stated · Supply and install | No data yet | — |
| Injection of cracks in concrete floor slabs (epoxy or PU) | Crack injection in cracked slabs and surfaces by a Riyadh specialist contractor; ports, surface seal and resin; per linear metre of crack — Materials and labour for injecting the crack; inspection, coring and any structural strengthening excluded. | m | VAT not stated · Supply and install | No data yet | — |
| Replacement of floor expansion-joint sealant with polyurethane | Remove old sealant, clean, backer rod and one-part PU sealant in a 20 mm wide × 15 mm deep floor joint — Sealant and labour; backer rod, primer, joint saw-cutting, arris repair and plant excluded. | m | VAT not stated · Supply and install | No data yet | — |
Every price here comes from the QSM Database: a market price on the date shown with it, with the conditions it holds for. The price on your order changes with quantity, supplier, payment terms and delivery point.